Harlington Renovation

Have Your Say

3 Renovation Options

The Harlington has been at the heart of our community for decades — a place to enjoy, perform, learn and connect. After years of service, it’s time to secure its future for the benefit of Fleet and our community.

As we enter the next phase of the Harlington Renovation Project, we need your vote. Please review the three options below, each offering a different level of modern refurbishment for this much-loved venue.

 All Options A, B and C include:

  • Upgraded auditorium with retractable tiered seating
  • New balcony seating to increase capacity
  • Complete replacement of heating & electrical systems
  • Improved building efficiency and environmental impact; including wall and roof insulation and double glazing
  • New upgraded toilet facilities
  • Replacement of floor and ceiling finishes
  • Replacement of doors and windows
  • Some thermal and acoustic upgrades
  • Many behind the scenes improvements to bring the building up to current building standards and improve building operations
  • New improved façade and access to the building
  • Redecoration throughout
  • Reduction in subsidies to release funds for other Town Council projects

 

Please scroll down to see additional information on each option…

 

Image of flyer being posted through letterbox in door
page header - dark blue background with lighter blue arch shapes

View Options & Cast Your Vote

Please take a moment to read through all the information provided below and then vote for your preferred option using the link below by the 15th November!

Option A

Can be done within the existing Fleet Town Council element of your Council tax

Provides all the elements listed above.

Option B

Would require an increase of approx. £6* per year (4%) for a Band D household

View increase for different Tax Bands here 

This option includes all of the above in Option A plus the list below:

  • New relocated staircase to first floor to meet current building regulations
  • More open and larger ground floor foyer area

 

  • Improved first floor foyer and more accessible supporting facilities

 

VIEW FLOORPLANS

Option C

Would require an increase of approx. £18* per year (14%) for a Band D household

View increase for different Tax Bands here 

This option includes all of the above in Option A and B plus:

  • A larger hireable multi-functional studio space on first floor
  • A larger separately hireable space on the ground floor
  • “Changing Places” facility for those with complex disabilities

 

  • Significant changes to the front façade including improved accessibility and landscaping
  • With this option, The Harlington will be expected to make contributions to other Town Council projects

 

VIEW FLOORPLANS

DON’T FORGET TO VOTE FOR YOUR PREFERED OPTION

Things to consider:
• Future proofing The Harlington for generations to come
• Accessibility and inclusion for everyone
• Environmental responsibility and lower running costs
• Economic and social benefits for our town
• Preserving our heritage while inspiring our future

Harlington History

Why renovate? What’s the history of The Harlington?

View Harlington History

FAQ’s

Have a question? Check out our FAQs or come along and chat to us at The Harlington Consultation

View our FAQs
Image of The Harlington a versatile venue in the heart of Fleet community.

Council Tax Bands

Costs and % given are rounded to the nearest figure. This is specific to the project and additional to inflation.

View how much you’ll pay

Have we missed a question you’d like answered?

Come and chat with us at The Harlington Consultation

Starting 1st November

The Harlington, 236 Fleet Road, Fleet, GU51 4BY

Project Architects, BFF, will be available for two sessions on Tuesday 4th November 13:30 – 14:30 and 19:30 – 20:30.

Can’t make it? Contact us

01252 625246